Skip to main content

Operational Advice Notices

An Operational Advice Notice is used to advise of any operational change.

An Operational Advice Notice is used to advise of any operational change, which will not prompt a permanent amendment to a regulatory document but which requires to be communicated to users.

An Operational Advice Notice would be issued to:-

  • Re-emphasise or clarify an existing procedure or instruction
  • Communicate a temporary change to processes, procedures or personnel
  • Notify pertinent Work in Progress and its impact on the operational function

OAN 041-2021 - STAND 1 CONCRETE PAVEMENT BAY REPLACEMENTS

OAN 040-2021 - ELECTRICAL MAINTENANCE SHUTDOWNS - TERMINAL 3

OAN 038-2021 – TERMINAL 2 BAGGAGE SYSTEM UPGRADES (PP40)

OAN 037-2021 – AIRCRAFT FUEL HYDRANT SYSTEM NIGHT-TIME SHUTDOWNS

OAN 036-2021 - AIRCRAFT FUEL HYDRANT SYSTEM NIGHT-TIME SHUTDOWNS

OAN 035-2021 RWY 05R-23L MAINTENANCE REPAIRS & SURVEY

OAN 034-2021 SWISSPORT DE-ICING TANK REPLACEMENT

OAN 033-2021 - AVDGS UPGRADES

OAN 026-2021 SOUTHERN FRONT GATES & BAGGAGE CAROUSELS RE-NUMBERING

OAN 025/2021 – INSTALLATION OF AIRCRAFT FUEL HYDRANT SYSTEM CATHODIC PROTECTION GROUND BED

OAN 024/2021 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE CLOSURES

OAN 023/2020 – REMOVAL OF FORMER STORM ENGINEERING CABINS

OAN 022/2021 – INSTALLATION OF AIRCRAFT FUEL HYDRANT SYSTEM CATHODIC PROTECTION GROUND BED

OAN 021/2021 – 1 MINUTE SILENCE FUNERAL OF HIS ROYAL HIGHNESS, THE PRINCE PHILLIP, DUKE OF EDINBURGH

OAN 018/2021 – TAXIWAY PAPA PAVEMENT REPAIRS & NORTHSIDE PAVEMENT JOINT SEALING

OAN 017/2021 – RECONFIGURATION OF APRON ROAD MARKINGS - TERMINAL 2

OAN 014/2021 TEMPORARY AIRFIELD ACCESS/EGRESS CHANGE – NORTH GATE

OAN 013-2021 Electrical Substation refurb – MASHCo Fuel farm

OAN 012-2021 Electrical Shutdowns H1 Sub T3

OAN 011-2021 Northside Pavement Repairs Phase 2

OAN 010-2021 Stand 915 Despatch cabin

OAN 009-2021 Northside Taxiway Pavement repairs

OAN 008-2021 Airfield Hydrant Outage

OAN 007-2021 AVDGS upgrades

OAN 006-2021 Overnight North side pavement repairs

OAN 005-2021 Rwy 05L-23R Night time maintenance

OAN 004-2021 Removal of former Storm Engineering cabins

OAN 002-2021 High Voltage Cable replacements

OAN 001i-2021 TEMPORARY OPERATING ARRANGEMENTS

OAN 001g-2021 Updated: COVID-19 Temporary Operating Arrangements

OAN 001f/2021 UPDATED: COVID-19 TEMPORARY OPERATING ARRANGEMENTS

OAN 001c-2021 Temporary Operating Arrangements

OAN 92/20 MASHCo VALVE CHAMBER WORKS

OAN 91/20 TESTING OF AERONAUTICAL GROUND LIGHTING (AGL) CONTROL SOFTWARE (PP03)

OAN 89/20 TERMINAL 2 IT UPGRADES

OAN 88/20 ORGANISED FIREWORK DISPLAYS

OAN 87/20 ARMISTICE DAY, REMEMBRANCE SUNDAY

OAN 068-2020 TWY ECHO CONSTRUCTION

OAN 40h-2020 - TEMPORARY OPERATING ARRANGEMENTS 

OAN 055-2020 COVID-19 GENERAL DECLARATION PROCESS 

OAN 059-2020 - FLOW BY TERMINAL

OAN 065-2020 FUEL HYDRANT PILOT VALVE UPGRADES 

OAN 067-2020 DUCT INSTALLATION - TAXIWAY DELTA 

OAN 070-2020 – MASHCo HYDRANT COMMISSIONING 

OAN 071-2020 TAXIWAY DELTA PAVEMENT RECONSTRUCTION 

OAN 037-2020 MAG TRUNK RADIO DIGITAL UPGRADE

OAN 036-2020 PASSENGER SEPARATION

OAN 032/2020 - Runway Operating Hours

OAN 019/2020 – CORONAVIRUS 2020

OAN 015-2020 ASTL ZULU FUEL HYDRANT WORKS Fp

OAN 002-2020 – OPENING OF NEW REMOTE STANDS 807, 809 & 811

OAN 39/2019 – ATC TOW PRIORITIES

OAN 29/2019 B737 MAX TWY JULIET PARKING

OAN 121-2018 LAUNCH OF AIRPORT COMMUNITY APP TO REPLACE OPERATIONAL SMS

OAN 103/2018  AIRBAND RADIO 8.33kHz FREQUENCY CHANGES 

OAN 59-2018 AMENDMENTS TO MA R PERMIT RT REQUIREMENTS

OAN 073-2020 REMOVAL OF TEMP CP FENCE - TWY ZULU

OAN 063-2020 MAN-TP PP04 RECONFIGURATION OF STDS 73 & 74

OAN 069-2020 STD 211 WORKS

OAN 072-2020 MASHCo B1D